Select Page
×
×

"*" indicates required fields

This field is for validation purposes and should be left unchanged.
Applying for Bradford WEEE processing centre position
Your Full Name*
Your Address
Accepted file types: docx, pdf, Max. file size: 512 MB.
Accepted file types: docx, pdf, Max. file size: 512 MB.
Log In +

AATF approved

AATF WEEE processing centre in Bradford

Bulk commercial
WEEE recycling in West Yorkshire

Our Bradford centre is an AATF-approved WEEE processing facility for organisations that produce electrical and IT waste in volume. The 38,000 sq ft site currently processes 300–350 tonnes of WEEE a month, backed by more than 30 years of industry experience.

WEEE arrives from sites across the UK through scheduled collections, WEEE pallet collection and trade deliveries. It is dismantled, segregated and sent into approved recovery streams in line with our zero to landfill policy.

We take everything from whole WEEE and IT equipment to chip and pin terminals, UPS systems, PCBs, components, cables, heat sinks and specialist high-value material fractions, combining processing capability with the commercial value, traceability and compliance our partners need.

Data-bearing equipment stays under a documented chain of custody and goes through certified data destruction before any materials are recovered.

38,000 sq ft

Bradford processing centre

300–350

Tonnes processed each month

30+

Years of industry experience

SITE CREDENTIALS

Approved, permitted and audit-ready

 Procurement and compliance teams can check every credential before awarding a contract. The full documents are in our Bradford compliance pack.

 

  • AATF approval: WEE/JP0002ZS/ATF, issued by the Environment Agency
  • Environmental permit: EPR/WE5737AB
  • Certifications: ISO 9001 (quality), ISO 14001 (environmental) and ISO 27001 (information security)
  • Export: AE (Approval of Export)
  • Transport: registered waste carrier with a goods vehicle operator’s licence
  • Operator: EGO Technology (Processing) Ltd, company number 08552015
  • Address: Unit 5, Bulmer & Lumb, Royds Hall Lane, Buttershaw, Bradford BD6 2NE
EGO Technology team dismantling IT equipment at the Bradford WEEE processing centre

Equipment and materials
we process

Bradford provides a high-capacity route for a wide range of WEEE, IT equipment and recoverable material streams, including:

Components

PCBs

Cables

Heat sinks

Circuit boards separated for material recovery at the Bradford centre

WHO IT’S FOR

Processing capacity for large organisations and trade partners

Bradford is set up for bulk volumes rather than single items. It is the processing hub for:

How WEEE is processed at Bradford

Every load follows the same controlled process, so you know where your equipment went and what happened to it.

Collection and intake

Nationwide collection with full traceability. Loads arrive on our licensed vehicles or from trade partners, then are booked in, weighed and recorded against your waste transfer documentation.

Data security first

Data-bearing devices are identified at intake and securely erased at our technical centre, under a documented chain of custody with serial-level certificates.

Dismantling and segregation

Equipment is assessed and separated into the right streams, from whole units and components for reuse to PCBs, cables, metals, plastics and batteries.

Recovery and reporting

Reusable equipment is routed for reuse and recovered materials go back into supply chains. As an AATF we issue WEEE evidence notes, and documentation is available through our Genesis Portal.

Getting your WEEE to Bradford

Scheduled bulk collections from offices, warehouses, depots and factories nationwide, arranged by our collection and logistics team.

WEEE pallet collection using WEEE-Go pallet boxes placed across your estate and collected when full.

Full loads and trade delivery-in for ITAD providers, recyclers and compliance schemes, by arrangement.

EGO Technology lorry used for bulk WEEE collections

Built for better partnerships

Selling WEEE, PCBs or other recoverable material? We make it straightforward to trade, with competitive returns and a reliable service built around your business.

Competitive returns
Market-led valuations designed to maximise value.

Fast payments
Prompt, reliable payment with straightforward terms.

Flexible volumes
From individual loads to ongoing, high-volume supply.

Nationwide collections
Flexible logistics coordinated around your operation.

A partner you can rely on
More than 30 years of industry experience behind every relationship.

More value. Less hassle. Better partnerships.

Reporting that stands up to audit

Every load processed at Bradford is documented, from waste transfer notes through to recovery data, with documentation available through our Genesis Portal.

That gives you evidence across the key areas of ESG and compliance reporting:

Circular economy performance

Landfill diversion metrics

Carbon & scope 3 insight

Responsible material recovery data

This helps sustainability, procurement and governance teams evidence real environmental impact linked to their IT lifecycle activities.

READY WHEN YOU ARE

Book a bulk WEEE collection

Tell us what you have, roughly how much and where it is. We’ll arrange collection and processing at Bradford, with waste transfer documentation and recovery reporting as standard. Or call our Bradford team on 0113 242 4421 or email WEEE@egotechnology.co.uk.

Frequently asked questions

Is the Bradford WEEE processing centre AATF approved?

Yes. The Bradford centre is an Approved Authorised Treatment Facility, approval number WEE/JP0002ZS/ATF, issued by the Environment Agency. It operates under environmental permit EPR/WE5737AB.

Can you issue WEEE evidence notes?

Yes. As an AATF, we can issue evidence notes for WEEE received at Bradford that is reused, treated, recovered or recycled. This supports producers and producer compliance schemes in meeting their obligations under the WEEE Regulations 2013.

What volumes of WEEE do you accept?

We handle everything from individual loads to ongoing, high-volume supply, including pallet loads, full vehicle loads and regular collections across multiple sites. The Bradford centre currently processes 300–350 tonnes a month.

How do I book a WEEE collection?

Use our collection form to tell us what you have, roughly how much and where it is. We will confirm a collection date and provide the waste transfer documentation. You can also email WEEE@egotechnology.co.uk or call 0113 242 4421.

Where is the Bradford WEEE processing centre?

The centre is at Unit 5, Bulmer & Lumb, Royds Hall Lane, Buttershaw, Bradford BD6 2NE, in West Yorkshire. We collect from organisations across the UK.

How does Bradford work with your Burton upon Trent centre?

Our Burton upon Trent centre handles secure intake, data destruction and reuse-first assessment. Bradford provides specialist capacity for WEEE processing and material recovery. Together they give one chain of custody from collection to final recovery.